Brief: Discover the SSCG250-3000/8000 250kW 796 Nm Electric Dynamometer Test Bench System, designed for high accuracy, reliability, and cost-effective engine performance testing. This system integrates with DTC variable frequency inverters and Seelong's control system for precise torque and speed measurement.
Related Product Features:
High accuracy with torque measurement precision up to ±0.2% FS and speed measurement at ±1 R/min.
Dual functionality as both loading equipment and prime mover, enabling bidirectional power absorption and driving.
Advanced direct torque control technology for precise AC dynamometer torque management.
Energy-efficient design that returns generated power to the grid during operation.
Dynamic response speed under 5ms, thanks to low moment of inertia and high overload capacity.
Versatile application for testing diesel and gasoline engines, including emissions and fuel consumption.
Robust construction with forced cooling and an over-speed capacity of 120% for durability.
Customizable encoder options to meet specific testing requirements.
Các câu hỏi:
What is the minimum order quantity for the SSCG250-3000/8000 Electric Dynamometer?
We support trial orders starting from 1 piece for stock products.
How can I obtain more detailed information about the product?
Please provide your email address, and we will send you our electronic sample book with comprehensive details.
What is the lead time for the SSCG250-3000/8000 Electric Dynamometer?
The production cycle for dynamometers is typically 6-8 working weeks, with sensors taking 2-3 weeks. Contact us for other products.
Can the SSCG250-3000/8000 system be customized for specific testing needs?
Yes, the system can be tailored, including encoder customization, to meet unique testing requirements.